Contact Us

 Tel:+86 769 222 223 61

  Fax:+86 769 222 223 61

  E-mail:sales@ice-universe.com

  Web:www.ice-universe.com

Installation precautions of air cooler

Author:Dongguan Ice Universe Machinery Co., Ltd. Click: Time:2023-12-20 10:24:10



Dongguan Ice Universe Machinery(DIUM) is a reliable supplier of quality industrial water cooled chiller and screw type chiller, oil type chiller, we have a big factory, and is the main suppliers of mobile air conditioner.


Installation points of DIUM  air cooled series chiller


Installation precautions of air cooler 

First, installed indoors:


1) It is necessary to ensure that the indoor ambient temperature is lower than 36 ° C and can be circulated for ventilation;


2) The distance between the left and right sides of the chiller and the obstacles is greater than 1000mm (to ensure air absorption), and the distance between the top fan and the ceiling is not less than 1000mm (to ensure the diffusion of heat). It is recommended that the chiller be installed in the window and the factory area with good ventilation effect, and exhaust pipes or ventilation devices can be added if necessary.


Second, installed outdoors:


1) First confirm the installation distance, it is necessary to choose the right pump to meet the needs of the cooling cycle, increase the remote control line and alarm output line, you can control and monitor the use of the chiller in real time.


2) The chiller adopts waterproof electric box structure, and the exposed power cord needs to be lined with wire tubes. When the outdoor ambient temperature is too low, some antifreeze needs to be added to the water tank to ensure that it does not freeze.


3) When the water temperature is lower than 15 ° C, put a layer of thermal insulation foam on the pipe.


4) Note that the water tank inside the chiller is open, and the amount of water stored in the water pipe that is higher than the water level of the water tank should be considered when the water is stopped. If it exceeds a certain value, it will cause water overflow. If necessary, add a check valve at the water outlet and a solenoid valve at the return water outlet.


More industry refrigeration solutions welcome you to contact us.

Sincerely look forward to communicating with you and learning from each other.

Dongguan Ice Universe Machinery Co., Ltd. (DIUM)

service@evergrinding.com


Installation precautions of air cooler
Installation precautions of air cooler,First, installed indoors:Second, installed outdoors:
Long by picture save/share
0

 Tel:+86 769 222 223 61

  Fax:+86 769 222 223 61

  E-mail:service@evergrinding.com

  Web:www.ice-universe.com

  Office add:Room 908-2,Junma Building,No. 99,Kangfeng Rd.,DalangTown,Dongguan,Guangdong,China

 Plant: Hengli Town, Dongguan City, Guangdong Province,China

 

 Tel:+86 769 2222 2361

  Fax:+86 769 2222 2361

  E-mail:service@evergrinding.com

  Web:www.ice-universe.com

  Office add:Room 908-2,Junma Building,No. 99,Kangfeng Rd.,DalangTown,Dongguan,Guangdong,China

 Plant: Hengli Town, Dongguan City, Guangdong Province,China

 

DIUM | Cool Your World (Admin login

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了